Pre-engineered steel buildings for industrial, commercial & agricultural sites

Build faster, safer, and smarter. Bunney’s Inc. delivers turnkey metal buildings—engineered for Arizona’s heat, monsoon winds, and wide daily temperature swings. From concept to close-out, we handle design, foundations, structure, envelope, and MEP integration so your facility opens on time and performs for decades.

New to Bunney’s? Learn who we are and explore our capabilities.

Why teams choose Bunney’s

  • Design-build delivery: One accountable partner for architecture, engineering, permitting, and construction.

  • Arizona-ready engineering: Wind exposure, uplift, thermal movement, and drainage detailed for desert storms and microbursts.

  • Clear budgets & timelines: Up-front milestones, long-lead tracking, and value-engineering options.

  • Safety first: Site-specific plans, LOTO, hot-work controls, and daily JHAs.

  • Lifecycle focus: Warranty support, inspections, and maintenance programs to protect your investment.

Call Us for a Quote

Request a Quote















    Common project types

    • High-bay warehouses & cross-dock distribution

    • Manufacturing, light industrial, and flex space

    • Utility and water/wastewater facilities

    • Fleet, equipment, and agricultural storage

    • Offices, labs, and conditioned mezzanines

    • Public works and municipal service buildings

    Our process

    1. Programming & siting – goals, adjacencies, utilities, truck flow, and site constraints.

    2. Pre-engineered system selection – frame type, bay spacing, clear heights, crane/runway needs.

    3. Foundations – geotech review, slab/pier design, vibration and thermal movement joints.

    4. Envelope & performance – roof/wall panels, insulation strategy, daylighting, air/water barriers.

    5. MEP & fire protection – HVAC zoning, electrical distribution, compressed air/gases, sprinklers per hazard.

    6. Permitting & procurement – stamped drawings, energy compliance, long-lead management.

    7. Erection & QA/QC – sequence planning, bolt tensioning, plumb/line checks, leak testing.

    8. Close-out & handoff – O&M manuals, as-builts, warranties, training.

    Specs & options

    • Structures: Rigid frame, clear-span, multi-span, lean-to, mezzanines, cranes.

    • Roof systems: Standing-seam cool roofs, high-temp underlayments, snow/ice detailing for high-country projects.

    • Walls: Insulated metal panels (IMP), ribbed panels, architectural accents, masonry/CMU hybrids.

    • Thermal & IAQ: Fiberglass systems, IMP cores, or spray foam; thermal breaks and vapor control to prevent condensation.

    • Openings: Sectional/roll-up doors, high-speed doors, canopies, louvers, and daylighting.

    • Site work: Paving, drainage, curb & gutter, equipment pads, exterior utilities.

    Arizona considerations we design for

    • Monsoon resiliency: Uplift, lateral bracing, and high-capacity roof drains/scuppers.

    • Heat management: Cool-roof assemblies, shaded entries, and right-sized HVAC with economizers.

    • Energy code compliance: Envelope U-values, lighting power density, and commissioning documentation.

    • Dust & UV exposure: Coatings and sealants specified for high UV index and abrasive environments.

    Timeline & cost drivers

    Lead times and price are shaped by steel tonnage, clear height, crane loads, panel type, insulation R-values, site soils, utilities, and long-lead gear (electrical gear, RTUs, overhead doors). We provide early alternates to keep budgets predictable.

    Maintenance & warranties

    Post-turnover, we offer annual envelope inspections, roof fastener checks, sealant refreshes, and mechanical service to protect manufacturer warranties and avoid downtime.

    Ready to plan your project? Get a site walk and budgetary estimate from our team.

    Helpful links

    FAQs

    How long does a typical metal building project take?
    Small shells can erect in 6–10 weeks after permitting; larger or crane-ready facilities often run 4–8 months end-to-end, depending on scope and lead times.

    Are metal buildings energy efficient in Arizona’s heat?
    Yes—cool roofs, continuous insulation, insulated metal panels, and well-zoned HVAC keep loads in check and help meet state energy codes.

    Can you integrate offices and mezzanines inside the shell?
    Absolutely. We regularly add conditioned office cores, mezzanines, labs, and restrooms with full MEP and egress compliance.

    What foundations are typical on desert soils?
    Most projects use slab-on-grade with thickened edges or piers/grade beams where soils require. We base designs on geotech reports to control settlement and vibration.

    Do you handle permitting and inspections?
    Yes. We prepare stamped drawings, coordinate plan review, and manage special inspections and close-out documentation.

    Request a Quote for Metal Buildings