Metal fabrication for nuclear facilities

Quality, Safety & Reliability for Industrial and Nuclear Projects

ASME-certified welding sets the bar for safety and performance where failure isn’t an option. From power generation and water infrastructure to complex metal fabrication for nuclear facilities, code-aligned welding ensures joints withstand pressure, temperature, and time. Bunney’s Inc. delivers ASME-compliant welding and fabrication across Arizona and the Southwest with disciplined procedures and audit-ready documentation.

New to Bunney’s? Learn who we are and explore our capabilities.

What Is ASME-Certified Welding?

ASME (American Society of Mechanical Engineers) establishes codes and standards that govern how pressure equipment and piping are designed, welded, inspected, and documented. In practice, this means:

  • Qualified procedures & people: WPS/PQR development and welder performance qualifications per ASME Section IX

  • Code-aligned scopes: Work delivered to the applicable section(s) such as BPVC Sections I/VIII (boilers/pressure vessels) and ASME B31.1/B31.3 (power/process piping)

  • Verification: NDE (VT, PT/MT, UT/RT), hydro/pneumatic testing as specified

  • Traceability: Heat numbers, MTRs, filler control, weld maps, and turnover packages

For nuclear scopes, projects may reference ASME Section III and owner QA programs (e.g., NQA-1), depending on classification.

Call Us for a Quote

Request a Quote















    By submitting this form, you agree that Bunney's Inc. may use the information you provide to respond to your inquiry via email and phone. For more information about how we handle your information, please review our Privacy Policy.

    Why It Matters

    • Safety & compliance: Code-aligned welds reduce risk under pressure, temperature, and cyclic loading.

    • Reliability: Lower leak/failure rates, longer service life, fewer unplanned outages.

    • Regulatory acceptance: Facilitates approvals for pressure equipment and high-integrity piping.

    • Consistency: Repeatable results via documented procedures and qualified personnel.

    Applications We Support

    • Power Generation: Boilers/HRSG components, steam lines, headers, and balance-of-plant piping.

    • Water & Wastewater: Process, distribution, chemical dosing, and high-integrity pump stations.

    • Oil, Gas & Chemical: Pressure vessels, alloy spools, controlled bolting and testing.

    • Manufacturing/Industrial: Utility piping, pressure equipment, structural attachments.

    • Nuclear Facilities: Metal fabrication for nuclear environments (e.g., stainless/nickel-alloy spools, supports, and component repairs) executed under plant procedures, with documentation suitable for audits.

    Materials & Processes

    • Materials: Carbon steel, stainless (304/316/347), low-alloy steels, and nickel alloys (e.g., Inconel®) per service requirements.

    • Processes: GTAW/TIG, SMAW, GMAW, and orbital GTAW for repeatable, high-integrity welds—selected by code, geometry, and access.

    How Bunney’s Inc. Delivers

    1. Scope & Engineering Coordination – Code classification, joint design, material selection

    2. Procedure & Personnel Qualification – WPS/PQR/WPQ with mockups where needed

    3. Fabrication & Field Installation – Cleanliness controls, purge management, interpass monitoring

    4. Inspection & Testing – NDE, hydro/pneumatic tests, and dimensional checks

    5. Turnover – Weld maps, MTRs, NDE reports, pressure-test logs, and as-builts

    ASME-Certified Welding in Arizona

    Arizona’s climate (heat, UV, dust, monsoon humidity) demands robust fabrication practices, weather-resistant coatings/jacketing, and carefully planned outage windows. Our teams mobilize quickly statewide and coordinate with owner procedures to keep schedules tight and documentation complete.

    Why Choose Bunney’s Inc.

    • Code-aligned execution for power, water, and industrial clients

    • Alloy expertise (stainless and nickel alloys) and orbital GTAW capability

    • Traceable QA/QC with audit-ready documentation

    • Safety-first culture and site-specific training

    • Rapid mobilization for outages and time-critical repairs

    Related Services:

    FAQs

    What’s the difference between Section IX and B31.1/B31.3?
    Section IX governs how procedures and welders are qualified; B31.1/B31.3 set design/fabrication rules for power/process piping.

    Do you provide full material traceability?
    Yes—heat numbers, MTRs, filler lot control, and weld maps are included in the turnover package.

    Can you work during operations?
    Many tie-ins and repairs can be executed under controlled conditions; intrusive work is typically scheduled in planned outages.

    Which NDE methods do you use?
    Project-dependent: VT, PT/MT (surface), UT/RT (volumetric), and pressure testing per code and owner specs.

    Do you handle nuclear-environment fabrication?
    We support metal fabrication for nuclear facilities under owner procedures and documentation requirements, coordinating with plant QA and engineering.

    Request a ASME-certified welding
    ASME-certified welding
    ASME-certified welding