Bunney’s Inc. delivers industrial, commercial, and municipal asphalt paving across Arizona—built for desert heat and monsoon seasons. From new construction to mill-and-overlay programs, we focus on lifecycle value, safety, and tight schedule control.

New to Bunney’s? See About Us, explore Capabilities, and browse Projects.

Why owners choose Bunney’s

  • Arizona-ready mixes tuned for UV, high temps, and heavy loads

  • Integrated delivery with grading, utilities, and Civil Construction

  • Safety & compliance (MOT/traffic control, ADA, striping)

  • Lifecycle support via Facility Maintenance

Call Us for a Quote

Request a Quote















    Asphalt paving services

    • New construction paving – subgrade prep, base course, binder/surface lifts

    • Mill & overlay – extend life, improve ride, correct cross-slope

    • Patch & pothole repair – infra-red/skin patches to full-depth repairs

    • Crack sealing & sealcoating – protect against water and oxidation

    • Striping & ADA upgrades – layouts, signage, and curb ramps

    • Drainage & grading – swales, inlets, and positive flow to reduce standing water

    • Concrete tie-ins – curb & gutter, Concrete Flatwork, and aprons

    Have a lot past its prime? See Parking Lot Repairs and Concrete Repairs.

    How we deliver (typical workflow)

    1. Assessment & plan – cores (if required), drainage review, striping/ADA scope

    2. Prep – milling, base repair, edge keys, utility adjustments

    3. Pave – lift thickness per design; temperature-controlled placement

    4. Compaction & QC – rolling patterns, density checks, joints

    5. Finish – striping, signage, site cleanup, punch list

    6. Closeout – as-builts, test results, maintenance plan

    Arizona-specific considerations

    • Heat & UV: polymer-modified binders and timely compaction windows

    • Monsoon readiness: crowned sections, inlets, and slope to manage intense rainfall

    • Dust & erosion: BMPs per SWPPP—see Dust Control and Erosion Control

    FAQs

    How long before traffic can use a new overlay?
    Light traffic typically same day after cool-down; striping/ADA within 24–48 hours, project-dependent.

    Can you phase work to keep access open?
    Yes—staged paving and MOT plans minimize business disruption.

    Do you handle drainage fixes with the pave?
    We correct grades, add inlets, and repair base failures to address standing water.

    What’s the best maintenance cadence?
    Annual crack sealing; sealcoat every 3–5 years depending on traffic and exposure. See Facility Maintenance.

     

    Request a Quote for Paving Work