Bunney’s Inc. designs and installs cement pads / concrete equipment pads for commercial, industrial, and municipal sites across Arizona. From generator and chiller pads to transformer foundations and housekeeping pads, we focus on proper subgrade preparation, reinforcement, and finishing so your equipment sits on a stable, long-lasting base.
New to Bunney’s? Learn who we are and explore our capabilities.
Why Choose Bunney’s Inc.
-
Arizona-ready methods: Mix designs, joints, and curing practices tuned for heat, UV, dust, and monsoon conditions.
-
Safety & quality control: Procedures aligned with our Safety program; documented inspections and tests.
-
End-to-end delivery: Layout, excavation, base prep, forms, rebar/anchors, placement, finishing, curing, and closeout.
-
Coordination with trades: We align embeds, sleeves, and bolt patterns with OEM drawings and your MEP scope—see our mechanical services.
-
Proven work: Browse our project portfolio.
What We Build
-
Equipment & generator pads – Level, reinforced slabs with sleeves, conduits, and anchor bolt templates.
-
Transformer & switchgear pads – Elevated or fenced pads with grounding provisions and cable trench coordination.
-
Housekeeping pads – Raised pedestals for pumps, MCCs, air handlers, and skids.
-
Slabs for small structures – Enclosures, kiosks, and utility buildings (see concrete flatwork).
Need ongoing care? Our facility maintenance services cover joint sealing, crack repair, and resealing.
Specifications That Matter (and Why)
-
Subgrade & base – Proof-roll, moisture condition, and compact to spec to prevent settlement and pumping.
-
Thickness & reinforcement – Section sized to load; rebar/WWE and dowels placed per design for load paths and edge protection.
-
Anchors & embeds – Templates set to OEM bolt circles; sleeves/conduits coordinated to avoid rework.
-
Jointing plan – Correct spacing/depth to control shrinkage cracking; isolation joints at columns, walls, and fixed equipment.
-
Finish & slopes – Broom or trowel finish per use; positive drainage away from pads and penetrations.
-
Curing & protection – Curing compounds/blankets and barricades to protect early-age concrete in Arizona heat.
Installation Process
-
Assessment & Layout – Verify loads, equipment footprints, penetrations, elevations, and access.
-
Subgrade Prep & Forms – Excavate, compact base, set forms to line/grade, install vapor barrier (as specified).
-
Reinforcement & Embeds – Place rebar/mesh, dowels, conduit sleeves, and anchor bolts; QA checks before pour.
-
Placement & Finishing – Controlled slump, strike-off, bull float, finish (broom/trowel), and edge tooling.
-
Joints & Curing – Timed saw cuts, curing application, and edge protection; remove forms and patch edges.
-
Closeout – Punch list, cleaning, and handover with care/traffic guidelines.
Arizona-Specific Considerations
-
Heat & UV: Accelerate hydration—use proper curing and joint timing to reduce curl and random cracking.
-
Monsoon events: Protect fresh placements; design drainage to move water off and around pads.
-
Expansive/caliche soils: Address with subgrade treatment and base thickness; choose sealers to resist salts.
Industries We Serve
Power & utilities • Manufacturing • Water/wastewater • Logistics & distribution • Data centers & commercial campuses • Public sector
Other concrete services: equipment pads, curb and gutter services, concrete walkways, concrete pads, concrete repairs, sidewalk construction, concrete benches, concrete pad installation, concrete barriers, parking curbs, cement slabs, barrier walls, concrete slabs, concrete flatwork, jersey barriers, cement pads, precast concrete.